You are here: Home Fields of activity Photovoltaic Achievements

Achievements

  • DETANDT-SIMON (Ghlin) : 150 kWp- : economic and technical feasibility and administrative procedures (in service).
  • STANDARD DE LIEGE (Liège), UCM (Wierde), Servimat (Fleurus-Heppignies), LAZZERINI (Ghlin), FLAMEXCO (Wanfercée-Baulet), INTERSAC (Mettet), MEUBLES AU BOSQUET (Chatelineau), LES DAUPHINS (Mouscron), INDUSTRIE CHASSIS PHILIPPE (Manage), DRAFIL (Mouscron) : administrative procedures (in service).
  • LA LORRAINE (Arlon) : 130 kWp : technical and economic feasibility study.
  • CHEMVIRON CARBON (Feluy) : 725 kWp : technical and economic feasibility study.
  • MALCOURANT (Gembloux) : 110 kWp : technical and economic feasibility and administrative procedures.
  • HARAS DE WISBECQ (Rebecq) : 110 kWp : technical and economic feasibility, administrative procedures and commissioning (in service).
  • MONUMENT HAINAUT (Marquain) : 210 kWp : technical and economic feasibility, administrative procedures and establishment of the specifications (in service).
  • JOHN MARTIN (Genval) : 63 kWp : technical and economic feasibility, administrative procedures and supervision of the commissioning (in service).
  • VANHEEDE BIOMASS SOLUTIONS (Quévy) : 250 kWp : technical and economic feasibility, administrative procedures and examination of the offers (in service).
  • MONNAIE-BAYS (Strépy) : 250 kWp : technical and economic feasibility, administrative procedures and supervision of the realization and commissioning (in service).