References and achievements

Wind parks :

    • KDE : Erquelinnes park (wind park electrical network and grid connection)
    • VENTIS + Associates : expanding of the Quévy park (co-development of the park)
    • PELZ : Leuze-Europe park (co-development of the park)
    • VENTIS : parks of Dour and Quévy (preliminary studies)
    • EDF-Luminus (SPE) : parks of Fernelmont, Verlaine,  Floreffe, Berloz, Ciney, Gent, Antwerpen and Thuin (wind park electrical network and electrical cabins)
    • NEO ENERGIA : parks of  d’Ayssènes (Aveyron), Bourbriac (Côtes d’Armor), Saint-Alban (Côtes d’Armor) and  Calanhel (Côtes d’Armor) (wind park electrical network and electrical cabins)
    • GREENWIND : parks of Froidchapelle, Cerfontaine and Chimay (wind park electrical network and electrical cabins)
    • WINDVISION / ELIA : Estinnes park (wind park electrical network)
    • AIR ENERGY / MESA : parks of Perwez, Sombreffe and Fosses-la-Ville (preliminary studies)
    • CHEMVIRON CARBON : technical and economic feasibility study

Photovoltaic power plants :

    • DETANDT-SIMON (Ghlin) : 150 kWp- : economic and technical feasibility and administrative procedures (in service).
    • STANDARD DE LIEGE (Liège), UCM (Wierde), Servimat (Fleurus-Heppignies), LAZZERINI (Ghlin), FLAMEXCO (Wanfercée-Baulet), INTERSAC (Mettet), MEUBLES AU BOSQUET (Chatelineau), LES DAUPHINS (Mouscron), INDUSTRIE CHASSIS PHILIPPE (Manage), DRAFIL (Mouscron) : administrative procedures (in service).
    • LA LORRAINE (Arlon) : 130 kWp : technical and economic feasibility study.
    • CHEMVIRON CARBON (Feluy) : 725 kWp : technical and economic feasibility study.
    • MALCOURANT (Gembloux) : 110 kWp : technical and economic feasibility and administrative procedures.
    • HARAS DE WISBECQ (Rebecq) : 110 kWp : technical and economic feasibility, administrative procedures and commissioning (in service).
    • MONUMENT HAINAUT (Marquain) : 210 kWp : technical and economic feasibility, administrative procedures and establishment of the specifications (in service).
    • JOHN MARTIN (Genval) : 63 kWp : technical and economic feasibility, administrative procedures and supervision of the commissioning (in service).
    • VANHEEDE BIOMASS SOLUTIONS (Quévy) : 250 kWp : technical and economic feasibility, administrative procedures and examination of the offers (in service).
    • MONNAIE-BAYS (Strépy) : 250 kWp : technical and economic feasibility, administrative procedures and supervision of the realization and commissioning (in service).

Medium and high voltage network

      • RTE (France) : modelling of over 130 km of 225 kV power lines in PLS-CADD, computation of the clearances to ground and obstacles on these lines and drawing of the profiles plans.
      • ALPIQ (Switzerland) : study of a pylon on a 220 kV power line.
      • RTE-CNER (France) : validation of the 14.40 version of the PLS-CADD, PLS-POLE and TOWER softwares.
      • RTE-CNER (France) : mechanical and geometrical studies, using finite elements models, of short-circuits impact on spans inside the substations of Tavel (400 kV), Porcheville (90 kV), Herblay (63 kV), Saint-Victor (225 kV), Montereau (63 kV), Lannemezan (63 kV), Gonneville (90 kV) and Argentière (63 kV).
      • RTE-CNER (France) : serie of studies of a new concept of fiber poles with line-post insulators intended to limit the landscape impact of 90 kV power lines.
      • RTE (France) : studey of the transformation of a classical overhead line pylon into a overhead-underground interface pylon.
      • RTE-CNER (France) : serie of studies about the non-linear behaviour of conductors and the creep phenomenom.
    • RTE-CNER (France) :  Development of a Power Line software PLS-CADD/TOWER/PLS-POLE updates validation methodology
    • RTE-CNER (France) : validation of the Power Line software version 12.3 PLS-CADD, TOWER and PLS-POLE
    • RTE-CNER (France) : Development of both a methodology and a study in order to define the damage caused by the explosion of an industrial site on 7 power lines
    • ELIA : transposition of the TOWER software into Belgian norms
    • NEXANS : comparison between two new generation electrical conductors (Losag and ACSR) for a pilot project for Finland
    • FABRICOM : mechanics study of the metallic floor of the Bevercée power plant high voltage substation
    • FABRICOM : mechanics study of a gantry of the Bevercée power plant high voltage substation
    • ELIA : verification of mechanics calculation note of a fall protection system
    • FABRICOM : mechanics study of a fall protection system
    • ELIA : study of 380kV pylons from the power line Zomergem-Eecklo (Stevin project)
    • EDF-Luminus : MV/70kV outpost of the Thuin wind park : drafting of the technical purchase file
    • ORES : study, drafting of the technical purchase files and monitoring of the realization of the new 6 and 15kV electrical cabins from Antoing
    • ORES : study, drafting of the technical purchase files and monitoring of the realization of the new 10kV electrical cabin  from Petit Rechain
    • ORES : study,  drafting of the technical purchase files and monitoring of the realization of the new 15kV electrical cabin  from Hanzinelle
    • ORES : study,  drafting of the technical purchase files and monitoring of the realization of the new 11kV electrical cabin  from Saint-Mard
    • TRACTEBEL : 400 kV underground lines for coal plants in Germany and Holland (analysis of the offers)
    • RTE-CNER (France) : analysis of the behavior of high temperature power line conductors and historical conductors (see Publications)
    • RTE-CNER (France) : mechanics and geometry studies based on the Finite Element Method of the impact of short-circuit in the  power lines ending at the 400kV high voltage substation from Tavel, Chevalet, Avelin and Mastaing
    • RTE-CNER (France) : parametric study based on Experimental Design method concerning the electrodynamics hypothesis in order to define the study policy on the whole French territory
    • RTE-CNER (France) : calculus of the stability of high voltage towers (63 and 90 kV)
    • RTE-CNER (France) : diagnosis and security of 7 power lines in the North and Pas-de-Calais departments
    • ELIA : study of the impact of mobile aerials on the mechanics holding of 400kV pylons
    • ELIA : dynamics study based on the Finite Element Study of the mechanical loads induced in a span in case of short-circuit
    • ELIA (subcontractor for MONNAIE SA) : management of the framework agreement and realization of studies for mechanics work on high voltage pylons of ELIA network
    • ELIA : audit of power lines : 70kV Ciply-Pâturages and 150 kV Baudour-Chièvres

Legal expertise

  • BAATZ (GD Luxembourg) : Second expertise regarding an incident on a 63 kV underground line